Condensate pipeline "Urengoy — Surgut"
25.06.2024
Neftegazstroy LLC is engaged in the implementation of projects in the oil and gas industry. By order of Gazprom, the Urengoy — Surgut condensate pipeline was built and put into operation. It provides the supply of an oil and gas condensate mixture from the Urengoy condensate treatment plant to the Surgut plant for its stabilization. The length of the condensate pipeline is 2.18 thousand km. During its construction, metal cable-carrying systems of TM IEK® were used. The equipment was promptly manufactured and delivered to the facility, and was convenient for installation.