EN
VN

Bystrinsky Mining and Processing Plan

Bystrinsky Mining and Processing Plan


Bystrinsky Mining and Processing Plan 24.06.2024
At the end of October 2017, PJSC MMC Norilsk Nickel launched the Bystrinsky Mining and Processing Plant. The company was built from scratch in 4 years, located in Gazimursko-Zavodsky district of the Trans-Baikal Territory, 350 km from Chita. The Bystrinsky complex deposit with large reserves of copper, gold and iron is located here. The electrical engineering facilities of the powerful modern plant were equipped with metal trays, shields and IEK® cable-carrying systems.

Back to the list